OR-NotesJ E BeasleyOR-Notes are a series of introductory notes on topics that fall under the broad heading of the field of operations research (OR). They were originally used by me in an introductory OR course I give at Imperial College. They are now available for use by any students and teachers interested in OR subject to the following conditions. A full list of the topics available in OR-Notes can be found here. Linear programming solution examplesLinear programming example 1997 UG examA company makes two products (X and Y) using two machines (A and B). Each unit of X that is produced requires 50 minutes processing time on machine A and 30 minutes processing time on machine B. Each unit of Y that is produced requires 24 minutes processing time on machine A and 33 minutes processing time on machine B. At the start of the current week there are 30 units of X and 90 units of Y in stock. Available processing time on machine A is forecast to be 40 hours and on machine B is forecast to be 35 hours. The demand for X in the current week is forecast to be 75 units and for Y is forecast to be 95 units. Company policy is to maximise the combined sum of the units of X and the units of Y in stock at the end of the week.
SolutionLet
then the constraints are: The objective is: maximise (x+30-75) + (y+90-95) = (x+y-50) It is plain from the diagram below that the maximum occurs at the intersection of x=45 and 50x + 24y = 2400 Solving simultaneously, rather than by reading values off the graph, we have that x=45 and y=6.25 with the value of the objective function being 1.25 Linear programming example 1995 UG examThe demand for two products in each of the last four weeks is shown below. Week 1 2 3 4 Demand - product 1 23 27 34 40 Demand - product 2 11 13 15 14Apply exponential smoothing with a smoothing constant of 0.7 to generate a forecast for the demand for these products in week 5. These products are produced using two machines, X and Y. Each unit of product 1 that is produced requires 15 minutes processing on machine X and 25 minutes processing on machine Y. Each unit of product 2 that is produced requires 7 minutes processing on machine X and 45 minutes processing on machine Y. The available time on machine X in week 5 is forecast to be 20 hours and on machine Y in week 5 is forecast to be 15 hours. Each unit of product 1 sold in week 5 gives a contribution to profit of £10 and each unit of product 2 sold in week 5 gives a contribution to profit of £4. It may not be possible to produce enough to meet your forecast demand for these products in week 5 and each unit of unsatisfied demand for product 1 costs £3, each unit of unsatisfied demand for product 2 costs £1.
SolutionNote that the first part of the question is a forecasting question so it is solved below. For product 1 applying exponential smoothing with a smoothing constant of 0.7 we get: M1 = Y1 = 23 The forecast for week five is just the average for week 4 = M4 = 37.46 = 31 (as we cannot have fractional demand). For product 2 applying exponential smoothing with a smoothing constant of 0.7 we get: M1 = Y1 = 11 The forecast for week five is just the average for week 4 = M4 = 14.07 = 14 (as we cannot have fractional demand). We can now formulate the LP for week 5 using the two demand figures (37 for product 1 and 14 for product 2) derived above. Let x1 be the number of units of product 1 produced x2 be the number of units of product 2 produced where x1, x2>=0 The constraints are: 15x1 + 7x2 <= 20(60) machine X 25x1 + 45x2 <= 15(60) machine Y x1 <= 37 demand for product 1 x2 <= 14 demand for product 2 The objective is to maximise profit, i.e. maximise 10x1 + 4x2 - 3(37- x1) - 1(14-x2) i.e. maximise 13x1 + 5x2 - 125 The graph is shown below, from the graph we have that the solution occurs on the horizontal axis (x2=0) at x1=36 at which point the maximum profit is 13(36) + 5(0) - 125 = £343 Linear programming example 1994 UG examA company is involved in the production of two items (X and Y). The resources need to produce X and Y are twofold, namely machine time for automatic processing and craftsman time for hand finishing. The table below gives the number of minutes required for each item: Machine time Craftsman time Item X 13 20 Y 19 29The company has 40 hours of machine time available in the next working week but only 35 hours of craftsman time. Machine time is costed at £10 per hour worked and craftsman time is costed at £2 per hour worked. Both machine and craftsman idle times incur no costs. The revenue received for each item produced (all production is sold) is £20 for X and £30 for Y. The company has a specific contract to produce 10 items of X per week for a particular customer.
SolutionLet
then the LP is: maximise
subject to:
so that the objective function becomes maximise
i.e. maximise
subject to:
It is plain from the diagram below that the maximum occurs at the intersection of x=10 and 20x + 29y <= 2100 Solving simultaneously, rather than by reading values off the graph, we have that x=10 and y=65.52 with the value of the objective function being £1866.5 Linear programming example 1992 UG examA company manufactures two products (A and B) and the profit per unit sold is £3 and £5 respectively. Each product has to be assembled on a particular machine, each unit of product A taking 12 minutes of assembly time and each unit of product B 25 minutes of assembly time. The company estimates that the machine used for assembly has an effective working week of only 30 hours (due to maintenance/breakdown). Technological constraints mean that for every five units of product A produced at least two units of product B must be produced.
SolutionLet xA = number of units of A produced xB = number of units of B produced then the constraints are: 12xA + 25xB <= 30(60) (assembly time) xB >= 2(xA/5) i.e. xB - 0.4xA >= 0 i.e. 5xB >= 2xA (technological) where xA, xB >= 0 and the objective is maximise 3xA + 5xB It is plain from the diagram below that the maximum occurs at the intersection of 12xA + 25xB = 1800 and xB - 0.4xA = 0 Solving simultaneously, rather than by reading values off the graph, we have that: xA= (1800/22) = 81.8 xB= 0.4xA = 32.7 with the value of the objective function being £408.9 Doubling the assembly time available means that the assembly time constraint (currently 12xA + 25xB <= 1800) becomes 12xA + 25xB <= 2(1800) This new constraint will be parallel to the existing assembly time constraint so that the new optimal solution will lie at the intersection of 12xA + 25xB = 3600 and xB - 0.4xA = 0 i.e. at xA = (3600/22) = 163.6 xB= 0.4xA = 65.4 with the value of the objective function being £817.8 Hence we have made an additional profit of £(817.8-408.9) = £408.9 and this is the maximum amount we would be prepared to pay for the hire of the machine for doubling the assembly time. This is because if we pay more than this amount then we will reduce our maximum profit below the £408.9 we would have made without the new machine. Linear programming example 1988 UG examSolve minimise 4a + 5b + 6c subject to a + b >= 11 a - b <= 5 c - a - b = 0 7a >= 35 - 12b a >= 0 b >= 0 c >= 0 SolutionTo solve this LP we use the equation c-a-b=0 to put c=a+b (>= 0 as a >= 0 and b >= 0) and so the LP is reduced to minimise 4a + 5b + 6(a + b) = 10a + 11b subject to a + b >= 11 a - b <= 5 7a + 12b >= 35 a >= 0 b >= 0 From the diagram below the minimum occurs at the intersection of a - b = 5 and a + b = 11 i.e. a = 8 and b = 3 with c (= a + b) = 11 and the value of the objective function 10a + 11b = 80 + 33 = 113.
|